Sometimes installing a septic tank pump is needed especially in higher elevation areas. This pump works exceptionally well in pumping sewage to a distribution tank from septic chamber. Thus it ensures functionality of overall septic system. Though most of septic systems is based on gravity but this assistance becomes impractical and sometimes impossible sometimes as a result of distance or terrain.
You should think about installing a push in the septic tank installation in this example just to make certain smooth supply of water to the filed lines directly from the tank. Well, this can be a common technique that gives considerable difference from typical setup means of a septic tank system. Consider following step-by-step guideline to install your septic tank pump:
1 - Head to rear side of your tank and start digging a drain to the distribution box of field line. Dig around required width level, as an example if you are using a PVC pipe of 1.5 inches to install, then the trench must certanly be wide enough that fit this pipe. This terrain should also be 12 to 16 inches deep only (this is typical depth). Avoid making sharp bends or turns (keep them as fewer as possible) and keep field line straight. This technique definitely improves life span and reduces work pressure over pump to push water.
2 - There ought to be a submersible pump in your septic tank's outlet chamber. There should be separate chambers in your tank to make certain proper functioning of your pump. You will see mainly sludge buildup in the very first take but you'll see water mostly in the second chamber. Basic work of pump is to move water and it doesn't intend to move solid waste. Therefore, cleaning first chamber regularly must certanly be your following top priority, just to make certain proper flow of water to second chamber.
3 - Connect the outlet port of your septic tank pump to the trench line. Connection security must certanly be primary curiosity about this technique because later on repairing would have been a tough specially when tank if full. Ste your float switches properly since they help in activating pump whenever you get water depth reached to the predefined level in tank. Manufacturer settings should be thought about in defining pump settings.
4 - Use direct burial wiring for connecting pump motor with electricity. It is advised having separate breaker for the pump motor. An additional protection to pump could possibly be placing Ground Fault Circuit Interruption breaker because such devices reduces electrical shocks or short circuit issues. Considering expert help is advised particularly if you don't know much about electrical wiring.
5 - Now add some water to your tank just to test the pump. The pump should activate itself when the tank reaches its predefined depth level. Shut off the pump once it moves out water. In the end, septic tank must certanly be covered once you obtain confirmation that the septic tank pump is functioning properly.